In Chemicals

Air Liquide – ASU Installation

MARKET

Chemicals

OWNER

Air Liquide

TONNAGE

2,500 tons

LOCATION

Bay City, TX

Air Liquide Bay City is a 2700 metric ton/day air separation facility that produces oxygen, nitrogen and argon. The oxygen and nitrogen will be injected into Air Liquide’s Gulf Coast pipeline system that runs from the Texas/Louisiana border to Corpus Christi, TX providing products to multiple clients along the way. The argon will be liquified and sold into the retail market. GrayWolf was responsible for the installation of all of the equipment, piping, structural steel and insulation. The plant will be operational late 3rd quarter to early 4th quarter of 2021.

Quote: Integer auctor magna mi, non laoreet mi tristique sed. Nam tincidunt dui eleifend ecitur egestas. Pellentesque semper non erat et.

John Doe

-Western Australian Department of Treasury

Key Project Contacts

FIRSTNAME LASTNAME

Business Development

linkedin-blue

FIRSTNAME LASTNAME

Project Manager

linkedin-blue

FIRSTNAME LASTNAME

GM

linkedin-blue
Contact Us

We're not around right now. But you can send us an email and we'll get back to you, asap.

SPP3 Salt CrystallizerShintech Crystallizer Project