gCUB Building 2
MARKET
Data Centers
OWNER
Confidential
GENERAL CONTRACTOR
Holder Construction
TONNAGE
625 tons
LOCATION
New Albany, OH
In the preconstruction phase of the project, we collaborated closely with the contractor to define a comprehensive scope of work. This included the provision and installation of galvanized steel framing essential for supporting various MEP trades. Each trade had specific steel component requirements, and with our guidance, we streamlined the scope to minimize overlaps and fill any gaps.
Opting for a modular strategy, we supplied pre-assembled units for pipe racks and cable trays. Achieving this required extensive coordination with other trades to determine the most efficient assembly sizes and configurations. This meticulous planning significantly facilitated the field installation process, resulting in reduced on-site time and enhanced safety for the project.
Quote: Integer auctor magna mi, non laoreet mi tristique sed. Nam tincidunt dui eleifend ecitur egestas. Pellentesque semper non erat et.
John Doe
-Western Australian Department of Treasury
Key Contacts
JOE MILLER
Business Development
CHRIS MOSHELL
Project Manager
STEVEN HAYES
GM