Air Liquide – ASU Installation
MARKET
Chemicals
OWNER
Air Liquide
TONNAGE
2,500 tons
LOCATION
Bay City, TX
Air Liquide Bay City is a 2700 metric ton/day air separation facility that produces oxygen, nitrogen and argon. The oxygen and nitrogen will be injected into Air Liquide’s Gulf Coast pipeline system that runs from the Texas/Louisiana border to Corpus Christi, TX providing products to multiple clients along the way. The argon will be liquified and sold into the retail market. GrayWolf was responsible for the installation of all of the equipment, piping, structural steel and insulation. The plant will be operational late 3rd quarter to early 4th quarter of 2021.