In Healthcare

Chandler Regional Medical Center

MARKET

Healthcare

OWNER

Dignity Healthcare

GENERAL CONTRACTOR

McCarthy Builders

TONNAGE

1,200 tons

LOCATION

Chandler, AZ

This project included a 5-story patient tower addition to the Chandler Regional Medical Center Campus. It includes 1,200 tons of steel, 2 stair towers and 2 elevators. The building ties into the existing building at several locations.

This was a BIM coordinated project for which GrayWolf provided 3D models incorporated into a federated model. A federated model allows other trades to do clash detection with steel as well as other trade partner’s work. Erection utilized SidePlate’s patented bolted moment frame technology. This system reduces overall tonnage and accelerates the erection durations compared to traditional moment frames that require a great deal of field welding. With bolted SidePlate connections, all the welding is done in the shop at the connection and only bolting is required in the field.

This project was fabricated by an AISC fabrication shop and AISC erector supporting a high level of quality and accuracy.

Quote: Integer auctor magna mi, non laoreet mi tristique sed. Nam tincidunt dui eleifend ecitur egestas. Pellentesque semper non erat et.

John Doe

-Western Australian Department of Treasury

Key Project Contacts

FIRSTNAME LASTNAME

Business Development

linkedin-blue

FIRSTNAME LASTNAME

Project Manager

linkedin-blue

FIRSTNAME LASTNAME

GM

linkedin-blue

Let’s talk about
your next project


    Contact Us

    We're not around right now. But you can send us an email and we'll get back to you, asap.

    Banner Boswell Medical Center-GrayWolf Integrated Construction CompanyHonorHealth