CyrusOne Office Building & Data Center
MARKET
Data Centers
OWNER
CyrusOne
GENERAL CONTRACTOR
JE Dunn
TONNAGE
920 tons
LOCATION
Chandler, AZ
Architecturally and structurally unique, this project presented some unique engineering challenges. Our proactive approach to coordination and cooperation with all team members was critical to success.
At each end of the five-story main structure, there are 8’ tall plate girders cantilevered over two floors below and the floors below are cantilevered and suspended from the roof level girders. Each floor was 4” above its final position when first erected but settled to the correct finished floor elevation after all building components were installed. Each side of the building was created using a girder truss that ran the length and height of the building.
The long spans of diagonal steel created challenges for attachment to the main structure, which were coordinated with the exterior cladding. Cladding for the building was created by a framework of tubes that support a perforated scrim panel system. Each floor level has its own exterior network of grating walkways between the building exterior and the scrim framing window washing and maintenance.
Quote: Integer auctor magna mi, non laoreet mi tristique sed. Nam tincidunt dui eleifend ecitur egestas. Pellentesque semper non erat et.
John Doe
-Western Australian Department of Treasury