This is a project that included multiple new buildings and additions to existing buildings. Detailing and fabrication work began in August of 2018. Erection continued on through the end of 2019. The project included over 50 tons of steel and deck. The project was fabricated by an AISC fabrication shop, Milling Machinery and erected by Precision Steel Erectors. Nucor/Vulcraft detailed, engineered, and provided the joist framing system on the project. Using these trade partners we were able to provide outstanding results and coordination throughout the project.