Westin Anaheim Resort
MARKET
Leisure
OWNER
FJS, Inc.
GENERAL CONTRACTOR
KCS West
TONNAGE
780
LOCATION
Anaheim, CA
The Westin Anaheim Resort was a 9 story resort project that took about 1 year from detailing to completion of structural steel.
Besides the normal beams and columns it contained large trusses which were fabricated, shipped, and erected in 1 piece. There were also many barreled roofs made of structural steel which had to be rolled. The corners of the barreled roofs were challenging to fabricate and erect from structural steel members.
The project site was very tight with a small footprint outside of the buildings that many different cranes and pick points had to use to avoid disrupting the ongoing business of neighboring buildings. Our experienced erector assisted greatly with this challenge.
Quote: Integer auctor magna mi, non laoreet mi tristique sed. Nam tincidunt dui eleifend ecitur egestas. Pellentesque semper non erat et.
John Doe
-Western Australian Department of Treasury
Key Project Contacts
firstname lastname
Business Development
firstname lastname
Project Manager
firstname lastname
GM