Architecturally and structurally unique, this project presented engineering challenges. GrayWolf’s proactive approach to coordination and cooperation with all team members was critical to success.
At each end of the five-story main structure, there are 8’ tall plate girders cantilevered over two floors below and the floors below are cantilevered and suspended from the roof level girders. Each floor was 4” above its final position when first erected but settled to the correct finish floor elevation after all building components were installed. Each side of the building was created using a girder truss that ran the length and height of the building.
The long spans of diagonal steel created challenges for attachment to the main structure, which were coordinated with the exterior cladding. Cladding for the building was created by a framework of tubes that support a perforated scrim panel system. Each floor level has its own exterior network of grating walkways between the building exterior and the scrim framing window washing and maintenance.
John Doe
-Western Australian Department of Treasury
Key Contacts
JOE MILLER
Business Development
CHRIS MOSHELL
Project Manager
STEVEN HAYES
GM
MARKET
Government
CLIENT
Commercial Metals Company
LOCATION
Columbus, OH
Architecturally and structurally unique, this project presented engineering challenges. GrayWolf’s proactive approach to coordination and cooperation with all team members was critical to success.
At each end of the five-story main structure, there are 8’ tall plate girders cantilevered over two floors below and the floors below are cantilevered and suspended from the roof level girders. Each floor was 4” above its final position when first erected but settled to the correct finish floor elevation after all building components were installed. Each side of the building was created using a girder truss that ran the length and height of the building.
The long spans of diagonal steel created challenges for attachment to the main structure, which were coordinated with the exterior cladding. Cladding for the building was created by a framework of tubes that support a perforated scrim panel system. Each floor level has its own exterior network of grating walkways between the building exterior and the scrim framing window washing and maintenance.
Project capabilities provided through companies of DBM Global. Learn more about how we leverage both our construction and technology expertise held across our platform of companies to deliver a derisked end-to-end solution for your asset’s lifecycle.
Quote: Integer auctor magna mi, non laoreet mi tristique sed. Nam tincidunt dui eleifend ecitur egestas. Pellentesque semper non erat et.
John Doe
-Western Australian Department of Treasury
Key Project Contacts
FIRSTNAME LASTNAME
Business Development
FIRSTNAME LASTNAME
Project Manager
FIRSTNAME LASTNAME
GM