In Government

Franklin County Corrections Center

Leveraging the DBM Global platform of companies, GrayWolf is enabled to provide a complete end-to-end solution from design through to fabrication, construction and facility services. Learn more about how we can de-risk your next project.

MARKET

Government

CLIENT

Commercial Metals Company

LOCATION

Columbus, OH

Architecturally and structurally unique, this project presented engineering challenges. GrayWolf’s proactive approach to coordination and cooperation with all team members was critical to success.

At each end of the five-story main structure, there are 8’ tall plate girders cantilevered over two floors below and the floors below are cantilevered and suspended from the roof level girders. Each floor was 4” above its final position when first erected but settled to the correct finish floor elevation after all building components were installed. Each side of the building was created using a girder truss that ran the length and height of the building.

The long spans of diagonal steel created challenges for attachment to the main structure, which were coordinated with the exterior cladding. Cladding for the building was created by a framework of tubes that support a perforated scrim panel system. Each floor level has its own exterior network of grating walkways between the building exterior and the scrim framing window washing and maintenance.

John Doe

-Western Australian Department of Treasury

Key Contacts

JOE MILLER

Business Development

linkedin-blue

CHRIS MOSHELL

Project Manager

linkedin-blue

STEVEN HAYES

GM

linkedin-blue

MARKET

Government

CLIENT

Commercial Metals Company

LOCATION

Columbus, OH

Architecturally and structurally unique, this project presented engineering challenges. GrayWolf’s proactive approach to coordination and cooperation with all team members was critical to success.

At each end of the five-story main structure, there are 8’ tall plate girders cantilevered over two floors below and the floors below are cantilevered and suspended from the roof level girders. Each floor was 4” above its final position when first erected but settled to the correct finish floor elevation after all building components were installed. Each side of the building was created using a girder truss that ran the length and height of the building.

The long spans of diagonal steel created challenges for attachment to the main structure, which were coordinated with the exterior cladding. Cladding for the building was created by a framework of tubes that support a perforated scrim panel system. Each floor level has its own exterior network of grating walkways between the building exterior and the scrim framing window washing and maintenance.


Project capabilities provided through companies of DBM Global. Learn more about how we leverage both our construction and technology expertise held across our platform of companies to deliver a derisked end-to-end solution for your asset’s lifecycle.

Quote: Integer auctor magna mi, non laoreet mi tristique sed. Nam tincidunt dui eleifend ecitur egestas. Pellentesque semper non erat et.

John Doe

-Western Australian Department of Treasury

Key Project Contacts

FIRSTNAME LASTNAME

Business Development

linkedin-blue

FIRSTNAME LASTNAME

Project Manager

linkedin-blue

FIRSTNAME LASTNAME

GM

linkedin-blue

Let’s talk about
your next project


    Contact Us

    We're not around right now. But you can send us an email and we'll get back to you, asap.

    West-MEC Northwest CampusAgua Fria High School