Data Center Buildings 1 & 2
MARKET
Data Centers
OWNER
Confidential
GENERAL CONTRACTOR
Holder Construction
TONNAGE
9,500 tons
LOCATION
Social Circle, GA
The scope of work for this project included the supply and installation of primary and secondary structural steel, joists, deck and miscellaneous steel. We adhered to a compressed schedule that required multiple (2-3) cranes working at the same time to expedite the accelerated timeline. The timetable necessitated that multiple fabrication facilities be involved in order to keep the cranes going.
There were also strict safety guidelines in place, primarily regarding man lifts and minimal walking of the steel.
These projects involved very precise BIM coordination (+/- ½”), which entailed us working closely with the contractor and design team to coordinate over 500 MEP floor penetrations and supports to be installed prior to the elevated floors being poured.
This LEED Gold-certified structure utilizes renewable energy within its campus.
Quote: Integer auctor magna mi, non laoreet mi tristique sed. Nam tincidunt dui eleifend ecitur egestas. Pellentesque semper non erat et.
John Doe
-Western Australian Department of Treasury
Key Contacts
JOE MILLER
Business Development
CHRIS MOSHELL
Project Manager
STEVEN HAYES
GM