In Renewables

Rayos Del Sol Solar

MARKET

Renewables

OWNER

Hanwha Total Solar II, LLC

CLIENT

PCL

LOCATION

Cameron County, TX

Rayos Del Sol Solar is a part of the growing solar energy landscape in Texas. It provides 180MW of sustainable energy.

GrayWolf’s scope of work included purchasing, fabricating, coating and delivering 88,000 steel solar array piers to the 1800-acre solar project.

This project contained some unique challenges due to extremely corrosive soil conditions at the project site. These conditions forced the client’s project team to use heavier gauge steel than normally used in typical solar pier construction. Due to this, the GrayWolf production team had to account for the thicker steel and develop specialized pier cutting and punching processes, as well as custom-made dies and equipment that could meet the client’s on-site weekly production needs.

GrayWolf’s project team worked daily with the client’s site team to effectively coordinate and manage the logistics required to move daily truckload of materials from the fabrication facilities, to the galvanizer, to the site. The project was completed on time and the client was able to meet their pier installation schedule per their contract with the project owner.

Quote: Integer auctor magna mi, non laoreet mi tristique sed. Nam tincidunt dui eleifend ecitur egestas. Pellentesque semper non erat et.

John Doe

-Western Australian Department of Treasury

Key Contacts

JOE MILLER

Business Development

linkedin-blue

CHRIS MOSHELL

Project Manager

linkedin-blue

STEVEN HAYES

GM

linkedin-blue

Let’s talk about
your next project


    Contact Us

    We're not around right now. But you can send us an email and we'll get back to you, asap.