In Healthcare

Perth Children’s Hospital

Leveraging the DBM Global platform of companies, GrayWolf is enabled to provide a complete end-to-end solution from design through to fabrication, construction and facility services. Learn more about how we can de-risk your next project.

MARKET

Healthcare

CLIENT

John Holland

LOCATION

Perth, Australia

The Perth Children’s Hospital provides state of the art clinical care for future generations and facilities for paediatric research. It holds 298 beds, inpatient and outpatient care, ambulatory services and will house the State’s first paediatric trauma center.

Scope included the entirety of the BIM strategy, implementation and management for the project and BIM managers placed directly in the client’s project offices. Acting as an extension of the contractor team, BIM solutions were implemented ranging from initial model setup and coordination strategies, through to 4D simulations, 5D cost extraction and work packaging, and ultimately the transition of the fully as-built model to the customer’s facility management solution. These integrations within the project team enabled maximum utilization and benefit of the project BIM environment which included many individual models being updated and coordinated on a weekly basis.

There were 167 separate models created in various authoring software platforms and from a number of consultants, ranging from design consultants to sub-contractors. A key requirement for the project was an accurate and complete BIM model with all appropriate information for use in the management and maintenance of the facility after construction is completed. This required a facilities maintenance model that was dimensionally accurate, showing as built conditions as well as all fabrication, construction, installation, testing and commissioning information, with appropriate data to coordinate and cross reference to the facilities management and maintenance systems.

John Doe

-Western Australian Department of Treasury

Key Contacts

JOE MILLER

Business Development

linkedin-blue

CHRIS MOSHELL

Project Manager

linkedin-blue

STEVEN HAYES

GM

linkedin-blue

MARKET

Healthcare

CLIENT

John Holland

LOCATION

Perth, Australia

The Perth Children’s Hospital provides state of the art clinical care for future generations and facilities for paediatric research. It holds 298 beds, inpatient and outpatient care, ambulatory services and will house the State’s first paediatric trauma center.

We were responsible for the entirety of the BIM strategy, implementation and management for the project and located BIM managers directly within the client’s project offices. Acting as an extension of the contractor team, we implemented BIM solutions ranging from initial model setup and coordination strategies, through to 4D simulations, 5D cost extraction and work packaging, and ultimately the transition of the fully as-built model to the customer’s facility management solution. These integrations within the project team enabled us to maximize the utilization and benefit of the project BIM environment which included many individual models being updated and coordinated on a weekly basis.

There were 167 separate models created in various authoring software platforms and from a number of consultants, ranging from design consultants to sub-contractors. A key requirement for the project was an accurate and complete BIM model with all appropriate information for use in the management and maintenance of the facility after construction is completed. This required a facilities maintenance model that was dimensionally accurate, showing as built conditions as well as all fabrication, construction, installation, testing and commissioning information, with appropriate data to coordinate and cross reference to the facilities management and maintenance systems.


Project capabilities provided through companies of DBM Global. Learn more about how we leverage both our construction and technology expertise held across our platform of companies to deliver a derisked end-to-end solution for your asset’s lifecycle.

Quote: Integer auctor magna mi, non laoreet mi tristique sed. Nam tincidunt dui eleifend ecitur egestas. Pellentesque semper non erat et.

John Doe

-Western Australian Department of Treasury

Key Project Contacts

FIRSTNAME LASTNAME

Business Development

linkedin-blue

FIRSTNAME LASTNAME

Project Manager

linkedin-blue

FIRSTNAME LASTNAME

GM

linkedin-blue
Contact Us

We're not around right now. But you can send us an email and we'll get back to you, asap.

HonorHealthYuma Regional Medical Center