Tech Square Data Center
MARKET
Data Centers
OWNER
DataBank
GENERAL CONTRACTOR
DPR
TONNAGE
732 tons
LOCATION
Atlanta, GA
GrayWolf’s scope of work for the Tech Square Data Center included providing the main structural steel frame and large screen wall at the roof.
Working in downtown Atlanta for this project, tight space required good coordination. We worked with the contractor to establish a location for our crane on an adjacent street. In doing so, we had a challenge of having to re-size the crane because the ground pressures of our crane, were exceeding the limits of what they could be. We were able to provide a smaller crane and utilize the tower crane to install the pieces that our new crane couldn’t reach.