Mustang NBY Building 2 gCUB

MARKET

Data Centers

OWNER

Confidential

GENERAL CONTRACTOR

Holder Construction

TONNAGE

625 tons

LOCATION

New Albany, OH

GrayWolf’s scope of work for the  entailed supply and installation of galvanized steel framing to support the various MEP trades.

During preconstruction of the Mustang NBY Building 2 gCUB project, we worked with the contractor to establish a scope of work including the supply and installation of galvanized steel framing to support the various MEP trades.

There were several trades (MEP) that had various steel components that were required. With our input we were able to develop a scope of work that reduced the amount of overlaps and gaps in what was required for the project. We went with a modular approach, providing assemblies for the pipe racks and cable trays. In order to accomplish this, we coordinated heavily with other trades to develop the most ideal assembly sizes and configurations. This helped immensely with the installation in the field. The result was less time on site and a much safer project.

Quote: Integer auctor magna mi, non laoreet mi tristique sed. Nam tincidunt dui eleifend ecitur egestas. Pellentesque semper non erat et.

John Doe

-Western Australian Department of Treasury

Key Contacts

JOE MILLER

Business Development

linkedin-blue

CHRIS MOSHELL

Project Manager

linkedin-blue

STEVEN HAYES

GM

linkedin-blue
Contact Us

We're not around right now. But you can send us an email and we'll get back to you, asap.

Tech Square Data Center