GRAYWOLF CASE STUDIES
De-Risking a Cooling Water Circuit Installation with End-to-End Execution.
Despite a 12-week schedule compression and major design obstacles, GrayWolf completed the CWC
and all structural work on time- ensuring facility readiness and unlocking two performance bonuses.
- ZERO lost time injuries
- 230,000+ craft hours worked
- 21,000 linear feet of piping installed
DOWNLOAD HERE
Fast-Tracking A Melt Shop Expansion with Real-Time Engineering and Self-Perform Strength.
GrayWolf successfully delivered a mission-critical scope in just 11 months, despite limited design
inputs and an intensely constrained environment. Our team’s ability to mobilize fast and execute with
precision ensured the caster would be operational in a timely manner.
- 300+ peak manpower
- 400,000+ hours worked
- 28,000 linear feet of piping installed
DOWNLOAD HERE