GRAYWOLF CASE STUDIES

De-Risking a Cooling Water Circuit Installation with End-to-End Execution.

Despite a 12-week schedule compression and major design obstacles, GrayWolf completed the CWC and all structural work on time- ensuring facility readiness and unlocking two performance bonuses.
  • ZERO lost time injuries
  • 230,000+ craft hours worked
  • 21,000 linear feet of piping installed
DOWNLOAD HERE

Fast-Tracking A Melt Shop Expansion with Real-Time Engineering and Self-Perform Strength.

GrayWolf successfully delivered a mission-critical scope in just 11 months, despite limited design inputs and an intensely constrained environment. Our team’s ability to mobilize fast and execute with precision ensured the caster would be operational in a timely manner.
  • 300+ peak manpower
  • 400,000+ hours worked
  • 28,000 linear feet of piping installed
DOWNLOAD HERE