Perth Children’s Hospital

The Perth Children’s Hospital provides state of the art clinical care for future generations and facilities for paediatric research. It holds 298 beds, inpatient and outpatient care, ambulatory services and will house the State’s first paediatric trauma center.

Scope included the entirety of the BIM strategy, implementation and management for the project and BIM managers placed directly in the client’s project offices. Acting as an extension of the contractor team, BIM solutions were implemented ranging from initial model setup and coordination strategies, through to 4D simulations, 5D cost extraction and work packaging, and ultimately the transition of the fully as-built model to the customer’s facility management solution. These integrations within the project team enabled maximum utilization and benefit of the project BIM environment which included many individual models being updated and coordinated on a weekly basis.

There were 167 separate models created in various authoring software platforms and from a number of consultants, ranging from design consultants to sub-contractors. A key requirement for the project was an accurate and complete BIM model with all appropriate information for use in the management and maintenance of the facility after construction is completed. This required a facilities maintenance model that was dimensionally accurate, showing as built conditions as well as all fabrication, construction, installation, testing and commissioning information, with appropriate data to coordinate and cross reference to the facilities management and maintenance systems.

MARKET
Healthcare
CLIENT
John Holland
LOCATION
Perth, Australia

LETS TALK ABOUT YOUR
NEXT PROJECT