Dickerson Station Absorber Erection
At the Mirant (Genon) 420 MW Dickerson Station, GrayWolf was selected for the erection of an alloy 255 Babcock and Wilcox Scrubber with installation of all internals, as well as the fabrication and erection of eight tanks located on this site.
The scrubber was built on the foundation in two modules to minimize the project schedule.