In Energy

Trimble County Air Quality Control Upgrade

MARKET

Energy

OWNER

Bechtel

CLIENT

Louisville Gas & Electric

LOCATION

Bedford, KY

The Trimble County Air Quality Control Upgrade project was the addition of a second unit at Louisville Gas and Electric’s Trimble County Generating Station. The contract was awarded to EPC. GrayWolf was hired direct by the EPC firm to perform four major tasks, along with associated smaller tasks. 

All scopes of work revolved around the unit’s environmental compliance systems including the erection of the Holtec condenser, C276 Siemens absorber, Siemens Moly 6 WESP, Hitachi two train SCR, and various tanks, silos, and ductwork. 

One of the complexities of this project was the design of the absorber. Highly skilled welding and craftsmanship were required, as most metals in these systems were complex and exotic. The lower portion of the absorber was carbon steel with C276 roll bonded cladding while the upper portion is solid C276. 

Despite the challenges, the project budget and schedule were maintained.

Quote: Integer auctor magna mi, non laoreet mi tristique sed. Nam tincidunt dui eleifend ecitur egestas. Pellentesque semper non erat et.

John Doe

-Western Australian Department of Treasury

Key Project Contacts

Greg Leavitt

Business Development

linkedin-blue

Mark Stoller

Project Manager

linkedin-blue

STEVEN HAYES

GM

linkedin-blue
Contact Us

We're not around right now. But you can send us an email and we'll get back to you, asap.

Dickerson ScrubberMiami Fort Absorber